Concept design — not a real client
Small-scale developments · Hertfordshire villages

New homes that belong where they're built.

We build in small numbers, in the villages we know — working with local materials and local trades, so each development sits like it's always been there.

6Completed developments
18yrsBuilding in Hertfordshire
4–12Homes per site
100%Local trades & suppliers
Currently building

Three sites, three very different villages.

Reserving now

The Maltings, Redbourn

6 brick-and-flint cottages set around a shared green, walking distance from the high street.

Under construction

Ver Meadow, Markyate

4 timber-clad family homes bordering open countryside, each with a private garden studio.

Planning submitted

Chapel Row, Flamstead

8 homes on a reclaimed orchard site, retaining as many mature trees as the layout allows.

From recent buyers

What it's like to move into an Ashfield Ridge home.

"They kept us updated at every stage of the build, not just when something needed signing off."

— The Maltings, Redbourn

"It genuinely looks like it belongs in the village. Not a single house on the estate looks 'new-build'."

— Ver Meadow, Markyate

"Snagging was dealt with properly and quickly — no chasing required."

— Previous development, Wheathampstead
Reserving now · Redbourn

The Maltings

6 brick-and-flint cottages around a shared green. 3 & 4 bedroom layouts, private gardens, off-street parking.

from £575,0002 remaining
Under construction · Markyate

Ver Meadow

4 timber-clad family homes on the edge of open countryside, each with a garden studio and EV charging point.

from £640,000Completing spring
Planning submitted · Flamstead

Chapel Row

8 homes on a reclaimed orchard site, designed to retain the site's mature trees and hedgerows.

Register interestEst. 2027
How it works

From reservation to keys, in four stages.

i.

Reserve

A refundable deposit holds your plot while you arrange your mortgage.

ii.

Choose finishes

A design appointment to select kitchen, flooring and fittings.

iii.

Exchange

Contracts exchanged with a build timeline confirmed in writing.

iv.

Move in

Full handover walkthrough, with snagging resolved before completion.